DRAFT PREVIEW · 内容待确认,未对外发布
Who you are buying from

A cabinet workshop, not a trading desk

We cut, machine and assemble aluminium mirror cabinets in our own workshop, with mirror processing and electrical components controlled to the same drawings. That is what makes a custom size possible without a six-week argument about tolerances.

In-house processes

Four things we do under one roof

01

Aluminium cutting & machining

6063-T5 profiles cut to length, mitred at 90°, drilled and tapped for M4 / M5 fixings. Cut lists are generated from the approved drawing so panels and profiles match batch to batch.

02

Mirror processing

3 mm and 5 mm silver mirror cut to size, edges processed, anti-shatter film applied to the coated face, and protection left on until packing.

03

Electrical assembly

Sensor switches, connectors and LED modules mounted into the aluminium electrical box with locknuts; each unit is powered and function-tested before it leaves the bench.

04

Export packing

Foam corner guards, mirror-face protection, individual carton and pallet loading, with a loading plan and photos before the container is sealed.

Workshop facts 待老板补充后上线

Location
城市 / 省份待补
Workshop area
㎡ 待补
Team
人数待补
Monthly capacity
产能待补(台/月)
Main equipment
设备清单待补
Export experience
出口国家 / 年限待补
Quality control

Checked at four points, not at the end

Mirror cabinets fail in predictable places. Our inspection points are placed where those failures start.

Incoming materialMirror batch checked for coating defects and edge chips; aluminium profile section and wall thickness checked against the approved sample.
Cutting & machiningCut length and hole position checked against the cut list; mitre angle checked before assembly.
AssemblyFrame squareness, door alignment and hinge adjustment checked on every unit; shelf bracket fit checked for play.
ElectricalSensor response, cable connector tightness and wiring continuity tested on 100% of units.
Before packingMirror surface inspected under angled light, film intact, accessories counted against the packing list.

Certification & compliance

Compliance documentation is confirmed per destination market before shipment. Current status of each certificate is stated on the quotation so there is no assumption on either side.

CE现状待确认(已有 / 办理中 / 不适用)
RoHS现状待确认
Other (UL / SAA / ERP)如目标市场需要,另行确认
DocumentationMaterial declaration and test reports provided when available for the ordered configuration.
Mirror cabinet installed in a bathroom
Working with us

What you get before you pay a deposit

  • Line-item quotation: material, hardware, packing, FOB cost — not a single lump number.
  • Dimensioned drawing of the exact configuration, including hole positions.
  • Packing specification and carton dimensions for your freight calculation.
  • Clear statement of MOQ, lead time and which certificates apply to the order.

Send a drawing, get a real answer.

English drawings and quotations within 12 working hours.

Contact us