DRAFT PREVIEW · 内容待确认,未对外发布
Mirror & cabinet manufacturer · China

Aluminium mirror cabinets,
built to your drawing.

We extrude, cut, assemble and pack bathroom mirror cabinets in one workshop — 6063-T5 aluminium frames, silver mirror with anti-shatter film, integrated sensor switch. OEM and ODM for wholesalers, project contractors and private-label brands.

BC-750 mirror cabinet installed in a bathroom
BC-750750 × 800 × 109 mm
  • OEM & ODMProduction from your drawing, sample or reference photo
  • Custom sizesWidth, height and depth adapted to your market
  • Export packingFoam corner guards, carton, pallet — container loaded
  • Full inspection100% mirror and electrical check before packing
Product range

Two cabinet platforms, one engineering standard

Both models share the same aluminium extrusion system, mirror specification and electrical architecture — so a mixed container keeps a consistent look and one spare-parts list.

Aluminium mirror cabinet 600 × 700 mm

BC-600 Mirror Cabinet

600 × 700 × 109 mm · wall mounted
2 glass shelvesRadar sensorFlip-down box
View specification
Aluminium mirror cabinet 750 × 800 mm with door open

BC-750 Mirror Cabinet

750 × 800 × 109 mm · left-hand door
2 glass shelvesSide mirror panelsDeep body
View specification

Also available on request: frameless mirrors, LED backlit mirrors, shaped mirrors and matching mirror cabinets. Ask for the full catalogue →

Why BathVue

Built by people who understand the extrusions

A mirror cabinet fails on the details: a shelf bracket that cracks, a sensor that triggers through the mirror coating, a carton that arrives with a broken corner. These are the details we design around.

01

Extrusion-first engineering

Frames are built on our own 6063-T5 profiles with mitred corners and mechanical fixings — not glued mitre joints. Section drawings are available for your approval before production.

02

Mirror specified for bathrooms

3 mm environmental silver mirror with a white anti-shatter film on the backing. Neutral silicone is used at fixing points to protect the coating from acid attack.

03

Electrics that survive humidity

Radar sensor and power connector are mounted through the aluminium electrical box with locknuts; wiring direction and voltage are confirmed with you before tooling.

04

Communication you can plan around

Quotation with a line-item BOM, dimensioned drawings, packing list and loading plan — in English, with the same document format for every order.

Inside the cabinet

Details that decide the rework rate

  • Mirror door with hydraulic hinges; hinge base position confirmed on the side panel drawing.
  • Two 5 mm glass shelves on transparent PC brackets — no metal clips to rust.
  • Electrical box flips down 90° for wiring access, then closes flush with the top panel.
  • Back panel mirror faces inward, with the coated side protected by film.
  • Every unit assembled and function-tested before it is packed.
Mirror cabinet with door open showing glass shelves and electrical box
How we work

From your drawing to your container

STEP 01

Inquiry & drawing

Send size, quantity and market requirements. We return a dimensioned proposal and clarify electrical and packing details.

STEP 02

Quotation

Line-item quotation with material, packing and FOB cost, valid 30 days. MOQ and lead time stated per model.

STEP 03

Sample & approval

Pre-production sample or drawing sign-off, including mirror, frame finish and switch behaviour.

STEP 04

Production & shipping

Batch production, 100% inspection, export packing and container loading photos before departure.

Tell us the size, we will tell you the price.

Quotation within 12 working hours · English drawings · FOB China main ports

Send an inquiry